FEATURED PROJECTS |
|
|
Grace
United Methodist Church,
Dayton OH
|
Work Scope:
100% Tuckpointing, Stone Replacement, Slate
Roof Restoration, New Lead Coated Copper Valleys &
Flashings, New Lead Coated Copper Through Wall
Flashings, New Lead Coated Copper Gutters & Downspouts |
|
|
|
|
|
|
 |
|
|
Limestone Cap
Stones Removed For Installation Of New Through Wall Flashings |
|
|
 |
|
|
Dormer Cap Stones
Shall Be Re-installed After Installation Of New Lead Coated
Copper Through Wall Flashings |
|
|
 |
|
|
Closed Slate
Valley Replacement & Mortar Joint Removal On Stone Masonry In
Progress |
|
|
 |
|
|
Mortar Joint
Removal On Gable Wall Partially Complete |
|
|
 |
|
|
Slate Was Removed
& Re-installed For Installation Of New Lead Coated Copper Gutter
& New LCC Flashings |
|
|
 |
|
|
Tracery Being
Re-set After Dutchman Repairs Of Fractured Segments |
|
|
 |
|
|
Close Up View Of
Dutchman Repair - Damaged Limestone Was Cut Out. New Limestone
Was Secured With Epoxy & S.S. Pins & Then Carved To Match
Original Profile |
|
|
 |
|
|
Original Tower
Saddleback Batten Seam Roof Before Replacement |
|
|
 |
|
|
New Copper Roof
Installed With Ornate Gutter Profile |
|
|
|
|
|